Progress construction RV Wim Wolff

 

Update June 2023

Construction of RV Wim Wolff continues steadily. Before the summer break as many internal systems as possible will be installed and completed. So that the exterior work can be painted when it is quiet on the yard (during the "construction holiday/bouwvak"). After that, the ship will be launched and extensive testing and crew training can take place in the fall. 

You can get a good impression by these phots (all taken by Feico Hoogeveen). Read more information in the monthly report of May. 

  View from the bridge to the aft deck. Materials are currently being stored on the sections of the deck where the synthetic deck panels have already been installed.  Most of the work of fitting the synthetic deck panels has already been completed. The base for the A-frame is clearly visible. Left: The gangway, with cabins to port and starboard. Right: The central heads are equipped with heated decks.  The generators in the engine room One of the drive shafts and electric motors, connected by a thrust bearing that transfers the propulsion power  to the vessel’s hull. Below the vessel we can see the drive shafts surrounded by the propeller duct.  Only the propeller needs to be installed. Left: The messroom with the open overhead and bulkheads. The pass-through hatches from the galley to the messroom are also visible in the bulkhead. Right:   View of the galley from the passageway, showing the installed appliances.  The messroom with the open overhead and bulkheads. The pass-through hatches from the galley to the messroom are also visible in the bulkhead.